On 12/04/25 starting at 00:00 CST to 15:00 CST we will be shutting down infrastructure to implement new data center switches for full network high-availability.

This will require a data center outage at some point in this time frame for at least 4 hours maximum, though our goal is no more than 1 hour. This is to allow cutover of network cables to critical compute and storage infrastructure, as they do not currently have HA networking and must be powered off for data integrity.

This is notice to expect outages on this date and time. This paves the way for future upgrades to not need outages like this again.